The Project Technologies Group


Quick Changeover Workshop

Summary

The current state machine set-up, or changeover, is videotaped. The tape is analyzed by the team, and used to design a future state with reduced changeover and increased machine up time.

Who Should Participate

8-12 shop floor personnel, including machine operators and set up personnel.

Deliverables

Participants will learn:

  • Identify adjustments that are waste
  • Preset tooling and gauging before setup
  • Transfer internal to external steps
  • Write standardized work
  • Develop procedures to examine, repair and store tools and gages
  • Use lifting devices, rollers and other mechanical devices to speed setup
  • Use positive stop devices to reduce adjustments
  • Locate prints, specs, and work instruction
  • To make standardized changeover instruction packets and learn how to schedule changeovers to minimize internal steps

Simplify record keeping for training and tracking

Prerequisites

None

Length

Two days.


The Project Technologies Group
Voice: (248)476-1234
Fax: (248)641-0210
Website: http://ProjectTech.com
E-mail: info@ProjectTech.com