PreviousNext

The Project Technologies Group


Healthcare Productivity Workshop

Summary

The Productivity Workshop, based on, and derived from and concepts learned in Value Stream Management and Lean Simulation Workshops, is rigorous and quantitative. The Productivity Event takes fundamentals learned in these workshops and applies those basics to the healthcare workplace.

Who Should Participate

8-12 personnel from designated clinical or administrative departments

Deliverables

During the workshop participants shall:

  • First document the current state, calculating lead time of the diagnostic and therapeutic service through the area, taking time observations, calculating Takt time,
  • Create an operator cycle time vs. Takt time bar chart
  • Using the time observations, identify waste of the current system and evaluate staffing requirements.
  • Create the future state, create an improvement plan, design new layout and calculate standard work
  • Finally, we'll put the changes to use by moving equipment, organizing tools and equipment at the point of use, time observe new operations, write standard work for new jobs, apply 5S principles as we make better the workplace to meet goals and objectives of the workshop.

Prerequisites

Value Stream Management and Lean Simulation Workshops

Length

Three days.


The Project Technologies Group
Voice: (248)476-1234
Fax: (248)641-0210
Website: http://ProjectTech.com
E-mail: info@ProjectTech.com

PreviousNext